Guides

Grid Trading Fees & Profit per Grid

A favourable price movement is not automatically net profit. Follow the money from a buy to a sell: fees on both sides affect the result.

BTC / USDTIllustration · Demonstration data
Fictional BTC/USDT candles: buy, price movement, then an illustrative take-profit sell. No historical performance or execution guarantee. 68,00067,50067,00066,50066,00010:0011:0012:0013:0014:0015:00
BuyBuy feeSell · take-profitSell fee
BuySellIllustrative level
01GROSS MOVEMENT IS NOT NET PROFIT

Gross movement is not net profit

A simple example: buy BTC for €100 before fees, then sell the same quantity for €101. With a 0.1% fee on each side, the net result is €0.799: €101 − €100 − €0.10 − €0.101.

This is an illustration, not a return forecast. It assumes fees paid separately in the quote currency and excludes slippage, rounding and other costs.

Full explanation

The buy consumes quote currency and may incur a buy fee. The later sell creates quote proceeds and may incur a sell fee. The cost basis for the sold quantity includes its allocated purchase cost and, where available, the associated buy fee. A simplified cycle calculation is:

The allocated buy cost covers the part of the original purchase related to the quantity being sold. This matters when only part of a position is closed.

Example cycle (illustration)Illustration · Demonstration data
  1. Buy€100Buy fee : €0.100 (0.1 %)
  2. Price increase+1%Sell proceeds: €101
  3. Sell€101Sell fee : €0.101 (0.1 %)
  4. Net cycle result+€0.799After both fees

101 − 100 − 0.100 − 0.101 = €0.799

The price rose by 1%, but the net result is smaller after buy and sell fees.

Sell proceeds−Sell fee−Allocated buy cost=Net result

Allocated cost includes available buy fees, without deducting them twice. It is apportioned to the quantity sold, including when a position is partially closed.

02WHY SPACING MATTERS

Why spacing matters

A grid with very small percentage spacing may create frequent targets, but each target leaves less room after both sides of the trade, price rounding, and exchange execution details.

There is no universal “profit per grid” amount. The result depends on the buy and sell prices, executed quantity, exchange fee treatment, precision, the portion sold, and the configured spacing and take-profit rate.

Small spacing
Nearby levels · smaller gross margin
  • Potentially more frequent targets
  • Smaller price movements
  • Less gross margin between levels

Nearby levels · smaller gross margin

Wider spacing
Wider levels · larger movement required
  • Potentially less frequent targets
  • Larger price movements
  • More potential gross margin

Wider levels · larger movement required

03FEE-AWARE SELL PROTECTION

Fee-aware sell protection

When NuxGrid creates a take-profit sell, it calculates the expected cost and proceeds before submitting the order. The effective take-profit rate includes the configured target and a conservative fee break-even check.

If the projected net result is not positive, the sell is blocked rather than treated as a profitable cycle. This protects against an obviously uneconomic target; it is not a guarantee of final profit after every live execution condition.

Before submitting the take-profit
  1. 1
    Buy filledCost allocated to the quantity to sell
  2. 2
    Estimate costsAvailable or estimated fees; sell fee rounded conservatively
  3. 3
    Check the thresholdConfigured target + fee-aware check
  4. 4
    Submit take-profitIf the checks allow submission

Unknown / zero allocated cost or projected result ≤ 0.01 in quote currency → sell not submitted

An order may be planned and then blocked before submission. The check guarantees neither execution nor final profit.

04REALIZED PROFIT AND OPEN-POSITION VALUE

Realized profit and open-position value

A completed sell cycle produces realized cycle profit according to the available execution data. An open position has a current market value, but that value is not realized profit until the position is closed.

Final equity and realized profit are therefore different measurements. Final equity can include cash, open positions, and a BTC reserve, while realized profit concerns completed sales.

Completed cycleBuy + sell filled
  • Realized profit known
  • Fees deducted
  • The cycle is closed
Position still openSell incomplete · remaining quantity
  • Market value can change
  • No realized result on the remainder
  • The cycle is not closed
Market value≠Realized profitEquity≠Realized profit

Partial sell: only the sold quantity’s result is realized; the remaining position stays open. A cancelled sell with partial fills may also contribute to conversion.

05OPTIONAL BTC CONVERSION

Optional BTC conversion

NuxGrid can allocate a configured percentage of positive completed-sell profit to BTC conversion. Contributions may accumulate until the exchange minimum is reached, and the Connector may group them into a later conversion order.

Conversion fees are tracked separately. A BTC reserve does not mean the original grid cycle had no trading costs.

Conversion example (illustration)Illustration · Demonstration data
  1. Cycle profit+€0.799Completed sell · positive result
  2. Configured sharee.g. 50%€0.3995 allocated · illustration
  3. BTC conversionBTC acquiredQuantity depends on actual price and fees
  4. BTC reserveBTC reserveAfter the conversion fills
+ + Small contributionsRequired minimum reachedLater conversion

The required minimum accounts for both the exchange minimum and configuration. Conversion fees are tracked separately.

A cycle in one line

  1. Buy
  2. Fees
  3. Price movement
  4. Sell
  5. Fees
  6. Net result
  7. Optional BTC

For educational purposes only. Not investment advice.